- Product Type
- Typical Reference
- Power plant design & EPC
Home > Product Center > Typical Reference
Industrial Power Generation
EPC project of 6MW Simple Cycle Power Plant for Dongfang terminal of CNOOC— put into operation from May 2009, operating hours exceed 34,000 equivalent operation hours till 2013 .

EPC project of 2×6MW Simple Cycle Power Plant for Weizhou terminal of CNOOC
—island operation from the end of 2012.
—island operation from the end of 2012.

Iran North Azadegan oil field power plant of CNPC
Four sets of UGT15000 Gas Turbine Generator supplied, which are under installation and commissioning under our supervision.
Four sets of UGT15000 Gas Turbine Generator supplied, which are under installation and commissioning under our supervision.

Ningbo Kefeng 1# Gas Turbine Combined Cycle Power plant Modification project
One set of H-25 Gas Turbine Generator supplied, handed over to the User for commercial operation after installation and commissioning.
One set of H-25 Gas Turbine Generator supplied, handed over to the User for commercial operation after installation and commissioning.

Mechanical drive
CNPC West-East gas pipeline project 30MW gas turbine driven compressor unitCNPC West-East gas pipeline project 30MW gas turbine driven compressor unit, is the first and the most difficult localized key equipment of China natural gas pipeline transmission project.
- 2010, signed contract with CNPC.
- 2011, October, the first unit was approved by China Energy Administration.
- 2014, September, finished manufacture and Factory test of five(5) units, which localization rate over 96%.
- 2014, October, three(3) sets of compressor unit were delivered to Wes-East pipeline-3 Yandun station.

Three sets of SGT400(12.9MW) gas turbine driven compressor unit, for CNOOC
Huangyan Terminal. Installation and commissioning is being proceeded.
Huangyan Terminal. Installation and commissioning is being proceeded.

3×UGT6000(6MW) gas turbine driven compressor units for OGDCL in Pakistan
3×UGT6000(6MW) gas turbine driven compressor units for OGDCL in Pakistan, have been shipped to Pakistan and preparing for installation and commissioning.
3×UGT6000(6MW) gas turbine driven compressor units for OGDCL in Pakistan, have been shipped to Pakistan and preparing for installation and commissioning.
